Harpwood Care Home

Project Brief

Replace an existing care home to provide a greater level of care and independence. Situated within the Green Belt, careful consideration is required to ensure the proposal works within the site limitations.

Outcome

The final design sought to make best use of the 14m level change on site, by creating separate building functions between ground and first floor. The proposed Care Home will provide ensuite bathrooms in every room and communal areas such as dining and lounges on each floor, a hair and beauty room and different garden levels to enhance and stimulate residents. Person centred care has been key in delivering a bespoke model for the Borough of Sevenoaks.

The new building takes local materials found in the neighbouring properties such as brick, render and clay tiles and arranges them into a traditional type of architecture with enhanced detailing whilst using the massing to provide a contemporary feel to the new development.

Details

Client:

The Graham Care Group

Value:

£12m

Scope of Services:

RIBA Stages 0-5

Programme:

Works due to start on site Oct 2019

Site Area:

1.75 Ha

Total m2:

6,240m2

Accommodation:

80 Care Bedrooms

ERNIE GRAHAM (GRAHAM CARE)

“Carless & Adams provide an excellent service from project conception right through to completion. They really understand our requirements and are very effective in working with planners to secure planning consent and then with project managers and contractors during the build process. We would recommend Melissa and her team to anyone seeking a knowledgeable architectural service providing help and advice at every stage in the process.”